What is established
Under construction. 330 MW announced (basis not stated by the source); owned or developed by AirTrunk.
What is not disclosed
Accelerator count, hardware platform, project capex, timeline, named tenant, power source, cooling technology — not disclosed by any source on this page. Recorded as unknown, never as zero.
Analyst note
AirTrunk (Blackstone) lists SYD3 at 330 MW+; industry trackers cite a >400 MW master plan. Serves hyperscale cloud/AI customers; anchor tenants not officially disclosed. Full campus not energized.
Physical work is under way and the evidence includes a primary source.
Power readiness
Capacity basis unclear
A megawatt figure exists but the source does not say whether it is IT load, site power or generation.
Derived from the evidence on this page by a published rule, not a model. How this is calculated.
-33.8000, 150.8600
No companies linked to this project yet.
| Metric | Value | Confidence | As of | Basis / methodology | Source |
|---|---|---|---|---|---|
| Power | 330 MW | High | Not disclosed | Basis: unclear. Announced target, not energized capacity. Note: AirTrunk (Blackstone) lists SYD3 at 330 MW+; industry trackers cite a >400 MW master plan. Serves hyperscale cloud/AI customers; anchor tenants not officially disclosed. Full campus not energized. | AirTrunk |
AirTrunk · Dec 24, 2025 · accessed Jul 28, 2026
SYD3 (330 MW+)
Reliability
95/100
AirTrunk (Blackstone) lists SYD3 at 330 MW+; industry trackers cite a >400 MW master plan. Serves hyperscale cloud/AI customers; anchor tenants not officially disclosed. Full campus not energized.
No revisions recorded.
No related projects by owner or country.