What is established
Announced. 360 MW announced (basis not stated by the source); 170,000 accelerators (NVIDIA Grace-Blackwell / Vera Rubin); expected Mar 2027; owned or developed by Firmus Technologies.
What is not disclosed
Project capex, named tenant, power source, cooling technology — not disclosed by any source on this page. Recorded as unknown, never as zero.
Analyst note
Co-developed with DayOne; NVIDIA compute partnership through 2034, GPU deliveries through 2027–28. The cited $25–30B is committed offtake revenue, not capex. First operations targeted Q1 2027. GPU count is the announced deployment ceiling ('up to 170,000').
Corroborated by more than one source, but not yet backed by physical evidence.
Power readiness
Capacity basis unclear
A megawatt figure exists but the source does not say whether it is IT load, site power or generation.
Derived from the evidence on this page by a published rule, not a model. How this is calculated.
NVIDIA Grace-Blackwell / Vera Rubin
1.0800, 104.0300
No companies linked to this project yet.
| Metric | Value | Confidence | As of | Basis / methodology | Source |
|---|---|---|---|---|---|
| Power | 360 MW | High | Not disclosed | Basis: unclear. Announced target, not energized capacity. Note: Co-developed with DayOne; NVIDIA compute partnership through 2034, GPU deliveries through 2027–28. The cited $25–30B is committed offtake revenue, not capex. First operations targeted Q1 2027. GPU count is the announced deployment ceiling ('up to 170,000'). | Firmus Technologies |
| GPU count | 170,000 GPUs | High | Not disclosed | Model: NVIDIA Grace-Blackwell / Vera Rubin. | Firmus Technologies |
Firmus Technologies · Jun 29, 2026 · accessed Jul 28, 2026
360 MW NVIDIA DSX AI Factory campus in Batam, Indonesia
Reliability
95/100
DataCenterDynamics · Jun 30, 2026 · accessed Jul 28, 2026
Firmus to deploy 170,000 GPU cluster in Batam, Indonesia
Reliability
78/100
Co-developed with DayOne; NVIDIA compute partnership through 2034, GPU deliveries through 2027–28. The cited $25–30B is committed offtake revenue, not capex. First operations targeted Q1 2027. GPU count is the announced deployment ceiling ('up to 170,000').
No revisions recorded.
No related projects by owner or country.