What is established
Operational. 24,000 accelerators (NVIDIA GH200); $587M announced investment; owned or developed by Forschungszentrum Jülich.
What is not disclosed
Capacity, timeline, named tenant, power source, cooling technology — not disclosed by any source on this page. Recorded as unknown, never as zero.
Analyst note
Europe's first exascale system, inaugurated September 2025 and in operation; funded 50% EuroHPC JU, 50% German federal/NRW. Capex includes six years of operations. A ~18 MW power figure circulates from TOP500 data but no quotable source was captured, so no MW is recorded.
Physical work is under way and the evidence includes a primary source.
Power readiness
No capacity disclosed
No megawatt figure has been sourced for this project.
Derived from the evidence on this page by a published rule, not a model. How this is calculated.
NVIDIA GH200
50.9040, 6.4040
No companies linked to this project yet.
| Metric | Value | Confidence | As of | Basis / methodology | Source |
|---|---|---|---|---|---|
| GPU count | 24,000 GPUs | High | Not disclosed | Model: NVIDIA GH200. | Forschungszentrum Jülich |
| Capex | $587,000,000 | High | Not disclosed | Announced investment figure. | Forschungszentrum Jülich |
Forschungszentrum Jülich · Sep 5, 2025 · accessed Jul 28, 2026
equipped with around 24,000 NVIDIA GH200 Grace Hopper superchips
Reliability
95/100
The Register · Sep 5, 2025 · accessed Jul 28, 2026
The total cost for Jupiter and operating it over six years is estimated to amount to €500 million ($587 million)
Reliability
65/100
Europe's first exascale system, inaugurated September 2025 and in operation; funded 50% EuroHPC JU, 50% German federal/NRW. Capex includes six years of operations. A ~18 MW power figure circulates from TOP500 data but no quotable source was captured, so no MW is recorded.
No revisions recorded.
Deutsche Telekom · Munich, Bavaria, Germany