Loading…
1 GW compute cluster inside the UAE–US AI Campus in Abu Dhabi, built by G42 and operated with OpenAI and Oracle.
24.4539, 54.3773
| Company | Role | Ticker | Notes |
|---|---|---|---|
| OpenAI | Operator | — | — |
| Oracle | Operator | ORCL | — |
| SoftBank Group | Investor | 9984.T | — |
| NVIDIA |
| Metric | Value | Confidence | As of | Basis / methodology | Source |
|---|---|---|---|---|---|
| Power | 1,000 MW | Medium | Not disclosed | Full cluster target. Phased: reporting indicates roughly 200 MW deployed by 2026 with the balance later. | G42 |
| Power | 200 MW | Medium |
G42 · Not disclosed · accessed Jul 27, 2026
Reliability
90/100
The 1 GW cluster sits inside a wider 5 GW UAE–US AI Campus. Only the 1 GW cluster is counted here — counting the campus envelope as well would double-count the same megawatts.
Created from G42 reporting.
Jul 27, 2026
System
No related projects by owner or country.
| GPU supplier |
| NVDA |
| — |
| Cisco | Networking supplier | CSCO | — |
| Not disclosed |
| Reported first phase by 2026. |
| G42 |