What is established
Under construction. 228 MW announced (basis not stated by the source); $3B announced investment; owned or developed by CloudHQ.
What is not disclosed
Accelerator count, hardware platform, timeline, named tenant, power source, cooling technology — not disclosed by any source on this page. Recorded as unknown, never as zero.
Analyst note
CloudHQ's first Latin America campus; press reports cite '$3.2B' but the sourced quote says 'more than $3 billion' — capex recorded at $3B floor. 225MW substation (expandable toward 400MW) energized; hyperscale AI/cloud tenants targeted. Roughly 100km from São Paulo metro.
Corroborated by more than one source, but not yet backed by physical evidence.
Power readiness
Capacity basis unclear
A megawatt figure exists but the source does not say whether it is IT load, site power or generation.
Derived from the evidence on this page by a published rule, not a model. How this is calculated.
-22.7590, -47.1540
No companies linked to this project yet.
| Metric | Value | Confidence | As of | Basis / methodology | Source |
|---|---|---|---|---|---|
| Power | 228 MW | Medium | Not disclosed | Basis: unclear. Announced target, not energized capacity. Note: CloudHQ's first Latin America campus; press reports cite '$3.2B' but the sourced quote says 'more than $3 billion' — capex recorded at $3B floor. 225MW substation (expandable toward 400MW) energized; hyperscale AI/cloud tenants targeted. Roughly 100km from São Paulo metro. | Baxtel |
| Capex | $3,000,000,000 | Medium | Not disclosed | Announced investment figure. | Baxtel |
BNamericas · Jan 1, 2025 · accessed Jul 29, 2026
With new substation, CloudHQ energizes São Paulo data center campus
Reliability
65/100
Baxtel · Mar 2, 2023 · accessed Jul 29, 2026
The new 228MW complex will have up to six buildings and more than $3 billion in investment. There will be three buildings in the first phase, each with a 48MW capacity.
Reliability
65/100
CloudHQ's first Latin America campus; press reports cite '$3.2B' but the sourced quote says 'more than $3 billion' — capex recorded at $3B floor. 225MW substation (expandable toward 400MW) energized; hyperscale AI/cloud tenants targeted. Roughly 100km from São Paulo metro.
No revisions recorded.