What is established
Under construction. 54 MW announced (basis not stated by the source); $500M announced investment; owned or developed by Scala Data Centers.
What is not disclosed
Accelerator count, hardware platform, timeline, named tenant, power source, cooling technology — not disclosed by any source on this page. Recorded as unknown, never as zero.
Analyst note
Aspirational full build is 4.75GW ('4.750MW distribuídos em mais de 7 milhões de metros quadrados') — among the largest DC ambitions in the Americas; MME granted a 5GW grid-reserve authorization, one of Brazil's largest ever. Only the 54MW/US$500M Phase 1 is committed; construction started after Eldorado do Sul enabling law was sanctioned. 100% renewable, PUE <=1.2 claimed, Malbec subsea-cable connectivity.
Physical work is under way and the evidence includes a primary source.
Power readiness
Capacity basis unclear
A megawatt figure exists but the source does not say whether it is IT load, site power or generation.
Derived from the evidence on this page by a published rule, not a model. How this is calculated.
-30.0840, -51.6190
No companies linked to this project yet.
| Metric | Value | Confidence | As of | Basis / methodology | Source |
|---|---|---|---|---|---|
| Power | 54 MW | High | Not disclosed | Basis: unclear. Announced target, not energized capacity. Note: Aspirational full build is 4.75GW ('4.750MW distribuídos em mais de 7 milhões de metros quadrados') — among the largest DC ambitions in the Americas; MME granted a 5GW grid-reserve authorization, one of Brazil's largest ever. Only the 54MW/US$500M Phase 1 is committed; construction started after Eldorado do Sul enabling law was sanctioned. 100% renewable, PUE <=1.2 claimed, Malbec subsea-cable connectivity. | Scala Data Centers via PR Newswire |
| Capex | $500,000,000 | High | Not disclosed | Announced investment figure. | Scala Data Centers via PR Newswire |
Scala Data Centers via PR Newswire · Sep 11, 2024 · accessed Jul 29, 2026
capacidade inicial de TI da Scala AI City será de 54 MW investimento inicial de cerca de R$ 3 bilhões (US$ 500 milhões) apenas na primeira fase
Reliability
95/100
AI Data Center Index · Jul 1, 2026 · accessed Jul 29, 2026
Brazil's Ministry of Mines and Energy authorized a 5 GW ramp-up connection
Reliability
65/100
Aspirational full build is 4.75GW ('4.750MW distribuídos em mais de 7 milhões de metros quadrados') — among the largest DC ambitions in the Americas; MME granted a 5GW grid-reserve authorization, one of Brazil's largest ever. Only the 54MW/US$500M Phase 1 is committed; construction started after Eldorado do Sul enabling law was sanctioned. 100% renewable, PUE <=1.2 claimed, Malbec subsea-cable connectivity.
No revisions recorded.
CloudHQ · Paulínia, São Paulo, Brazil
ByteDance · Caucaia / São Gonçalo do Amarante (Pecém port complex), Ceará, Brazil