What is established
Under construction. 200 MW announced (basis not stated by the source); 18,000 accelerators (NVIDIA GB300); expected Jun 2026; owned or developed by HUMAIN.
What is not disclosed
Project capex, named tenant, power source, cooling technology — not disclosed by any source on this page. Recorded as unknown, never as zero.
Analyst note
PIF-backed sovereign program. 200 MW covers the two under-construction launch sites (up to 100 MW each, Riyadh and Dammam), basis unstated. The 500 MW NVIDIA target, a separate 500 MW AMD collaboration and the up-to-6 GW-by-2034 ambition are aspirational and not recorded as capacity. No source confirms energization as of late July 2026.
Physical work is under way and the evidence includes a primary source.
Power readiness
Capacity basis unclear
A megawatt figure exists but the source does not say whether it is IT load, site power or generation.
Derived from the evidence on this page by a published rule, not a model. How this is calculated.
NVIDIA GB300
24.7136, 46.6753
The expected opening date has passed with no actual opening recorded. This project is in the verification queue.
No companies linked to this project yet.
| Metric | Value | Confidence | As of | Basis / methodology | Source |
|---|---|---|---|---|---|
| Power | 200 MW | High | Not disclosed | Basis: unclear. Announced target, not energized capacity. Note: PIF-backed sovereign program. 200 MW covers the two under-construction launch sites (up to 100 MW each, Riyadh and Dammam), basis unstated. The 500 MW NVIDIA target, a separate 500 MW AMD collaboration and the up-to-6 GW-by-2034 ambition are aspirational and not recorded as capacity. No source confirms energization as of late July 2026. | HUMAIN |
| GPU count | 18,000 GPUs | High | Not disclosed | Model: NVIDIA GB300. | HUMAIN |
HUMAIN · May 13, 2025 · accessed Jul 28, 2026
HUMAIN is making a major investment to build AI factories in the Kingdom of Saudi Arabia with a projected capacity of up to 500 megawatts
Reliability
95/100
NVIDIA · May 13, 2025 · accessed Jul 28, 2026
The first phase of deployment will be an 18,000 NVIDIA GB300 Grace Blackwell AI supercomputer with NVIDIA InfiniBand networking.
Reliability
95/100
Fast Company Middle East · Aug 26, 2025 · accessed Jul 28, 2026
Humain, Saudi Arabia's new artificial intelligence company, has begun construction of its first data centers in the Kingdom
Reliability
65/100
PIF-backed sovereign program. 200 MW covers the two under-construction launch sites (up to 100 MW each, Riyadh and Dammam), basis unstated. The 500 MW NVIDIA target, a separate 500 MW AMD collaboration and the up-to-6 GW-by-2034 ambition are aspirational and not recorded as capacity. No source confirms energization as of late July 2026.
No revisions recorded.
DataVolt · Oxagon, Tabuk Province, Saudi Arabia
HUMAIN · Saudi Arabia