Loading…
Every tracked AI infrastructure project. Green figures are confirmed; grey are analyst estimates. Filters and sort are stored in the URL, so any view can be shared or exported as-is.
| Owner | GPU model | Credibility | Power evidence | ||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| O'Leary Ventures | Greenview Industrial Gateway (south of Grande Prairie), Alberta, Canada | Hyperscale campus | Announced | 1.4 GWA? | Not disclosed | Not disclosed | Not disclosed | 2 months ago(2 src) | Medium confidence | Capacity basis unclear | |
| CoreWeaveCRWV | Cambridge, Ontario, Canada | AI factory | Operational | Not disclosed | Not disclosed | NVIDIA (latest generation) | Dec 31, 2025 | 2 months ago(3 src) | Medium confidence | No capacity disclosed | |
| Bell CanadaBCE | Kamloops, British Columbia, Canada | Sovereign AI | Partially operational | 66 MWA? | Not disclosed | Groq LPUs | Dec 31, 2026 | 2 months ago(2 src) | High confidence | Capacity basis unclear | |
| TELUST.TO | Rimouski, Quebec, Canada | Sovereign AI | Partially operational | Not disclosed | Not disclosed | NVIDIA Hopper/Blackwell (HPE systems) | Dec 31, 2026 | 2 months ago(3 src) | High confidence | No capacity disclosed | |
| eStruxture Data Centers | Rocky View County (Calgary area), Alberta, Canada | Colocation | Under construction | 90 MWA? | Not disclosed | Not disclosed | Dec 31, 2026 | 2 months ago(3 src) | High confidence | Capacity basis unclear |