Crusoe-developed capacity adjacent to Stargate Abilene, reported at roughly 900 MW after OpenAI declined the expansion.
What is established
Under construction. 900 MW announced (basis not stated by the source); expected Dec 2027; owned or developed by Crusoe Energy.
What is not disclosed
Accelerator count, hardware platform, project capex, named tenant, power source, cooling technology — not disclosed by any source on this page. Recorded as unknown, never as zero.
Analyst note
Tenancy is unsettled: OpenAI declined the expansion and Microsoft is reported to be in talks. Recorded as unattributed capacity rather than assigned to a tenant that has not signed.
Rumoured, MOU-stage, or resting on a single secondary report.
Power readiness
Capacity basis unclear
A megawatt figure exists but the source does not say whether it is IT load, site power or generation.
Derived from the evidence on this page by a published rule, not a model. How this is calculated.
32.4487, -99.7331
No companies linked to this project yet.
| Metric | Value | Confidence | As of | Basis / methodology | Source |
|---|---|---|---|---|---|
| Power | 900 MW | Low | Not disclosed | Reported adjacent capacity. Single secondary source and the offtake is unresolved. | DataCenterDynamics |
DataCenterDynamics · Not disclosed · accessed Jul 27, 2026
Reliability
78/100
Tenancy is unsettled: OpenAI declined the expansion and Microsoft is reported to be in talks. Recorded as unattributed capacity rather than assigned to a tenant that has not signed.
Created from DataCenterDynamics reporting.
Jul 27, 2026
System
Oracle · Abilene, Texas, United States
Galaxy Digital · Dickens, Texas (Dickens County), United States
Related Digital · Saline Township, Michigan, United States
Meta · New Albany, Ohio, United States
xAI · Memphis, Tennessee, United States
Applied Digital · Ellendale, North Dakota (Dickey County), United States