What is established
Under construction. 933 MW announced (gross site power); expected Dec 2026; owned or developed by Crusoe Energy.
What is not disclosed
Accelerator count, hardware platform, project capex, named tenant, power source, cooling technology — not disclosed by any source on this page. Recorded as unknown, never as zero.
Analyst note
Part of Google's November 2025 plan to 'invest $40 billion in Texas data centers' (Armstrong and Haskell counties) — capex null because $40B spans multiple sites. 'In January 2026, Crusoe filed a permit to build a 933 MW natural gas power plant onsite'; satellite imagery confirms two buildings under construction; first phase shares interconnection with a wind farm, segment due online in 2026. Third-party trackers list full build at ~1,030MW / 7 buildings / 3.4M sq ft. Distinct from Crusoe's covered Abilene (Stargate) campus and from Crusoe-Lancium's separately announced 1GW Childress partnership.
Corroborated by more than one source, but not yet backed by physical evidence.
Power readiness
Capacity basis stated
The source distinguishes IT load from total site power or on-site generation.
Derived from the evidence on this page by a published rule, not a model. How this is calculated.
35.1120, -101.3630
No companies linked to this project yet.
| Metric | Value | Confidence | As of | Basis / methodology | Source |
|---|---|---|---|---|---|
| Power | 933 MW | Medium | Not disclosed | Basis: site power. Announced target, not energized capacity. Note: Part of Google's November 2025 plan to 'invest $40 billion in Texas data centers' (Armstrong and Haskell counties) — capex null because $40B spans multiple sites. 'In January 2026, Crusoe filed a permit to build a 933 MW natural gas power plant onsite'; satellite imagery confirms two buildings under construction; first phase shares interconnection with a wind farm, segment due online in 2026. Third-party trackers list full build at ~1,030MW / 7 buildings / 3.4M sq ft. Distinct from Crusoe's covered Abilene (Stargate) campus and from Crusoe-Lancium's separately announced 1GW Childress partnership. | Latitude Media |
Latitude Media · Jan 1, 2026 · accessed Jul 29, 2026
The gigawatt-scale campus, developed in partnership with Google, will leverage 933 megawatts of off-grid fossil gas turbines
Reliability
65/100
Distilled / Cleanview · Jan 1, 2026 · accessed Jul 29, 2026
it has partnered with Crusoe Energy to develop a campus known as 'Goodnight,' near the town of Claude.
Reliability
65/100
Part of Google's November 2025 plan to 'invest $40 billion in Texas data centers' (Armstrong and Haskell counties) — capex null because $40B spans multiple sites. 'In January 2026, Crusoe filed a permit to build a 933 MW natural gas power plant onsite'; satellite imagery confirms two buildings under construction; first phase shares interconnection with a wind farm, segment due online in 2026. Third-party trackers list full build at ~1,030MW / 7 buildings / 3.4M sq ft. Distinct from Crusoe's covered Abilene (Stargate) campus and from Crusoe-Lancium's separately announced 1GW Childress partnership.
No revisions recorded.
Oracle · Abilene, Texas, United States
Galaxy Digital · Dickens, Texas (Dickens County), United States
Nebius Group · Butler Township, Pennsylvania, United States
Applied Digital · Ellendale, North Dakota (Dickey County), United States
Meta · New Albany, Ohio, United States
Related Digital · Saline Township, Michigan, United States