What is established
Announced. 760 MW announced (gross site power); owned or developed by CyrusOne.
What is not disclosed
Accelerator count, hardware platform, project capex, timeline, named tenant, power source, cooling technology — not disclosed by any source on this page. Recorded as unknown, never as zero.
Analyst note
CyrusOne's largest single announced US AI campus; brings Constellation/Calpine-contracted CyrusOne capacity in Texas to 'a total of over 1100 MW under contract' including the earlier 400MW Whitney/Bosque County campus (DFW10, first building topped out March 2026) at Calpine's Thad Hill Energy Center. No online date disclosed.
Announced and sourced, but nothing beyond announcement is evidenced.
Power readiness
Capacity basis stated
The source distinguishes IT load from total site power or on-site generation.
Derived from the evidence on this page by a published rule, not a model. How this is calculated.
31.7250, -96.1650
No companies linked to this project yet.
| Metric | Value | Confidence | As of | Basis / methodology | Source |
|---|---|---|---|---|---|
| Power | 760 MW | High | Not disclosed | Basis: site power. Announced target, not energized capacity. Note: CyrusOne's largest single announced US AI campus; brings Constellation/Calpine-contracted CyrusOne capacity in Texas to 'a total of over 1100 MW under contract' including the earlier 400MW Whitney/Bosque County campus (DFW10, first building topped out March 2026) at Calpine's Thad Hill Energy Center. No online date disclosed. | Constellation Energy |
Constellation Energy · Feb 9, 2026 · accessed Jul 29, 2026
exclusive agreement to provide power, grid connectivity and site infrastructure for Phase 2, which will be an additional 380 MW. The new facility will be located adjacent to Calpine's existing Freestone Energy Center, which is located approximately 80 miles southeast of Dallas.
Reliability
95/100
CyrusOne's largest single announced US AI campus; brings Constellation/Calpine-contracted CyrusOne capacity in Texas to 'a total of over 1100 MW under contract' including the earlier 400MW Whitney/Bosque County campus (DFW10, first building topped out March 2026) at Calpine's Thad Hill Energy Center. No online date disclosed.
No revisions recorded.
Oracle · Abilene, Texas, United States
Galaxy Digital · Dickens, Texas (Dickens County), United States
Nebius Group · Butler Township, Pennsylvania, United States
Applied Digital · Ellendale, North Dakota (Dickey County), United States
Meta · New Albany, Ohio, United States
Related Digital · Saline Township, Michigan, United States