What is established
Rumored. 3 GW announced (gross site power); $35B announced investment; expected Jan 2028; owned or developed by Fir Hills.
What is not disclosed
Accelerator count, hardware platform, named tenant, power source, cooling technology — not disclosed by any source on this page. Recorded as unknown, never as zero.
Analyst note
Claimed 3GW / ~$35bn (KRW 50tn) campus by Brian Koo's Stock Farm Road vehicle Fir Hills, in partnership with Jeollanam-do provincial government; construction targeted from winter 2025, completion 2028. DCD framing ('claims') reflects skepticism; as of 2026 the project remains in pre-construction/structuring. Sometimes reported alongside a Jeonju (North Jeolla) proposal — cited sources place this project in Jeollanam-do. 3GW is planned capacity, basis not broken out. Status RUMORED on review: DCD frames the project as a claim and no construction is documented.
Rumoured, MOU-stage, or resting on a single secondary report.
Power readiness
Capacity basis stated
The source distinguishes IT load from total site power or on-site generation.
Derived from the evidence on this page by a published rule, not a model. How this is calculated.
34.8100, 126.4600
No companies linked to this project yet.
| Metric | Value | Confidence | As of | Basis / methodology | Source |
|---|---|---|---|---|---|
| Power | 3,000 MW | High | Not disclosed | Basis: site power. Announced target, not energized capacity. Note: Claimed 3GW / ~$35bn (KRW 50tn) campus by Brian Koo's Stock Farm Road vehicle Fir Hills, in partnership with Jeollanam-do provincial government; construction targeted from winter 2025, completion 2028. DCD framing ('claims') reflects skepticism; as of 2026 the project remains in pre-construction/structuring. Sometimes reported alongside a Jeonju (North Jeolla) proposal — cited sources place this project in Jeollanam-do. 3GW is planned capacity, basis not broken out. Status RUMORED on review: DCD frames the project as a claim and no construction is documented. | DataCenterDynamics |
| Capex | $35,000,000,000 | High | Not disclosed | Announced investment figure. | DataCenterDynamics |
DataCenterDynamics · Feb 17, 2025 · accessed Jul 29, 2026
Fir Hills Inc claims it plans to build 3GW '$35bn' AI data center in South Korea
Reliability
95/100
Capacity Media · Feb 18, 2025 · accessed Jul 29, 2026
Initial annual revenue of $3.5 billion
Reliability
65/100
Claimed 3GW / ~$35bn (KRW 50tn) campus by Brian Koo's Stock Farm Road vehicle Fir Hills, in partnership with Jeollanam-do provincial government; construction targeted from winter 2025, completion 2028. DCD framing ('claims') reflects skepticism; as of 2026 the project remains in pre-construction/structuring. Sometimes reported alongside a Jeonju (North Jeolla) proposal — cited sources place this project in Jeollanam-do. 3GW is planned capacity, basis not broken out. Status RUMORED on review: DCD frames the project as a claim and no construction is documented.
No revisions recorded.
NAVER · Sejong, Sejong, South Korea
Samsung Group · Pohang, North Gyeongsang, South Korea
SK Group · Jeollanam-do, South Korea
SK Telecom · Ulsan, Ulsan, South Korea