What is established
Under construction. 168 MW announced (critical it load); expected Dec 2026; owned or developed by Fluidstack.
What is not disclosed
Accelerator count, hardware platform, project capex, named tenant, power source, cooling technology — not disclosed by any source on this page. Recorded as unknown, never as zero.
Analyst note
Originally a TeraWulf–Fluidstack 51/49 JV (Google-backed); in July 2026 TeraWulf sold its stake to a Fluidstack-led group. 168 MW critical IT / 240 MW gross site power. Delivery expected H2 2026. Widely reported as the Texas site of Anthropic's $50B Fluidstack program.
Physical work is under way and the evidence includes a primary source.
Power readiness
Capacity basis stated
The source distinguishes IT load from total site power or on-site generation.
Derived from the evidence on this page by a published rule, not a model. How this is calculated.
33.8320, -101.8430
No companies linked to this project yet.
| Metric | Value | Confidence | As of | Basis / methodology | Source |
|---|---|---|---|---|---|
| Power | 168 MW | High | Not disclosed | Basis: IT load. Announced target, not energized capacity. Note: Originally a TeraWulf–Fluidstack 51/49 JV (Google-backed); in July 2026 TeraWulf sold its stake to a Fluidstack-led group. 168 MW critical IT / 240 MW gross site power. Delivery expected H2 2026. Widely reported as the Texas site of Anthropic's $50B Fluidstack program. | TeraWulf |
TeraWulf · Jul 6, 2026 · accessed Jul 28, 2026
established in 2025 to develop a 168 MW critical IT load AI data center campus in Abernathy, Texas
Reliability
95/100
DataCenterDynamics · Not disclosed · accessed Jul 28, 2026
168MW of critical IT load (240MW gross) at a new 120-acre data center campus in Abernathy, Texas
Reliability
78/100
Originally a TeraWulf–Fluidstack 51/49 JV (Google-backed); in July 2026 TeraWulf sold its stake to a Fluidstack-led group. 168 MW critical IT / 240 MW gross site power. Delivery expected H2 2026. Widely reported as the Texas site of Anthropic's $50B Fluidstack program.
No revisions recorded.
Oracle · Abilene, Texas, United States
Galaxy Digital · Dickens, Texas (Dickens County), United States
Nebius Group · Butler Township, Pennsylvania, United States
Applied Digital · Ellendale, North Dakota (Dickey County), United States
Meta · New Albany, Ohio, United States
Related Digital · Saline Township, Michigan, United States