What is established
Under construction. 24 MW announced (basis not stated by the source); 10,000 accelerators (NVIDIA GB300); $500M announced investment; expected Jun 2026; owned or developed by Lambda.
What is not disclosed
Named tenant, power source, cooling technology — not disclosed by any source on this page. Recorded as unknown, never as zero.
Analyst note
Retrofit of a vacant facility; $500M per Missouri economic-development reporting. 24 MW at launch, potential to scale past 100 MW; energization not publicly confirmed as of July 2026. Announcement date approximate (Nov 2025).
Physical work is under way and the evidence includes a primary source.
Power readiness
Capacity basis unclear
A megawatt figure exists but the source does not say whether it is IT load, site power or generation.
Derived from the evidence on this page by a published rule, not a model. How this is calculated.
NVIDIA GB300
39.1000, -94.5790
The expected opening date has passed with no actual opening recorded. This project is in the verification queue.
No companies linked to this project yet.
| Metric | Value | Confidence | As of | Basis / methodology | Source |
|---|---|---|---|---|---|
| Power | 24 MW | High | Not disclosed | Basis: unclear. Announced target, not energized capacity. Note: Retrofit of a vacant facility; $500M per Missouri economic-development reporting. 24 MW at launch, potential to scale past 100 MW; energization not publicly confirmed as of July 2026. Announcement date approximate (Nov 2025). | Lambda |
| GPU count | 10,000 GPUs | High | Not disclosed | Model: NVIDIA GB300. | Lambda |
| Capex | $500,000,000 | High | Not disclosed | Announced investment figure. | Lambda |
Lambda · Not disclosed · accessed Jul 28, 2026
expected to launch in early 2026 with 24MW of capacity, and the potential to scale up to more than 100MW
Reliability
95/100
DataCenterDynamics · Not disclosed · accessed Jul 28, 2026
launch with over 10,000 NVIDIA Blackwell Ultra GPUs
Reliability
78/100
Retrofit of a vacant facility; $500M per Missouri economic-development reporting. 24 MW at launch, potential to scale past 100 MW; energization not publicly confirmed as of July 2026. Announcement date approximate (Nov 2025).
No revisions recorded.
Oracle · Abilene, Texas, United States
Galaxy Digital · Dickens, Texas (Dickens County), United States
Nebius Group · Butler Township, Pennsylvania, United States
Applied Digital · Ellendale, North Dakota (Dickey County), United States
Meta · New Albany, Ohio, United States
Related Digital · Saline Township, Michigan, United States