Stargate site at Lordstown, Ohio, announced by OpenAI with Oracle and SoftBank.
What is established
Under construction. expected Dec 2028; owned or developed by Oracle; tenant: OpenAI.
What is not disclosed
Capacity, accelerator count, hardware platform, project capex, power source, cooling technology — not disclosed by any source on this page. Recorded as unknown, never as zero.
Analyst note
Site confirmed by OpenAI; no per-site capacity published.
Physical work is under way and the evidence includes a primary source.
Power readiness
No capacity disclosed
No megawatt figure has been sourced for this project.
Derived from the evidence on this page by a published rule, not a model. How this is calculated.
41.1656, -80.8542
| Metric | Value | Confidence | As of | Basis / methodology | Source |
|---|---|---|---|---|---|
| Other | Site announced; no per-site capacity published. | High | Not disclosed | Named in OpenAI's announcement. Capacity not disclosed. | OpenAI |
OpenAI · Not disclosed · accessed Jul 27, 2026
Reliability
95/100
Site confirmed by OpenAI; no per-site capacity published.
Created from OpenAI reporting.
Jul 27, 2026
System
Oracle · Abilene, Texas, United States
Galaxy Digital · Dickens, Texas (Dickens County), United States
Nebius Group · Butler Township, Pennsylvania, United States
Applied Digital · Ellendale, North Dakota (Dickey County), United States
Meta · New Albany, Ohio, United States
Related Digital · Saline Township, Michigan, United States