What is established
Partially operational. 500 MW announced (gross site power); 50,000 accelerators (NVIDIA H100); owned or developed by Tesla.
What is not disclosed
Project capex, timeline, named tenant, power source, cooling technology — not disclosed by any source on this page. Recorded as unknown, never as zero.
Analyst note
Cortex 1 operational since 2024 at ~130 MW launch draw with 50,000 H100s shown; 500 MW is the stated full site-power target for the Cortex 2.0 expansion (reported mid-2026 completion). Larger 2026 GPU-count claims circulate only in weak sources and are not recorded.
Corroborated by more than one source, but not yet backed by physical evidence.
Power readiness
Capacity basis stated
The source distinguishes IT load from total site power or on-site generation.
Derived from the evidence on this page by a published rule, not a model. How this is calculated.
NVIDIA H100
30.2230, -97.6170
No companies linked to this project yet.
| Metric | Value | Confidence | As of | Basis / methodology | Source |
|---|---|---|---|---|---|
| Power | 500 MW | Medium | Not disclosed | Basis: site power. Announced target, not energized capacity. Note: Cortex 1 operational since 2024 at ~130 MW launch draw with 50,000 H100s shown; 500 MW is the stated full site-power target for the Cortex 2.0 expansion (reported mid-2026 completion). Larger 2026 GPU-count claims circulate only in weak sources and are not recorded. | Tom's Hardware |
| GPU count | 50,000 GPUs | Medium | Not disclosed | Model: NVIDIA H100. | Tom's Hardware |
Windows Central · Not disclosed · accessed Jul 28, 2026
expected to require 130 megawatts of cooling and power upon launch, growing to 500 megawatts
Reliability
65/100
Tom's Hardware · Aug 26, 2024 · accessed Jul 28, 2026
first look at Tesla's 50,000 Nvidia H100s
Reliability
65/100
Cortex 1 operational since 2024 at ~130 MW launch draw with 50,000 H100s shown; 500 MW is the stated full site-power target for the Cortex 2.0 expansion (reported mid-2026 completion). Larger 2026 GPU-count claims circulate only in weak sources and are not recorded.
No revisions recorded.
Oracle · Abilene, Texas, United States
Galaxy Digital · Dickens, Texas (Dickens County), United States
Nebius Group · Butler Township, Pennsylvania, United States
Applied Digital · Ellendale, North Dakota (Dickey County), United States
Meta · New Albany, Ohio, United States
Related Digital · Saline Township, Michigan, United States